Skip to main content

Technology

Setting up and feeding a Snowflake warehouse: ingesting your sources, modelling with dbt, access management and consumption tracking.

What we deliver with Snowflake

  • Migrating an existing warehouse to Snowflake
  • Ingestion pipelines and tested transformations
  • Cost control through virtual warehouses and alerts
Related serviceData engineering & data warehousesTalend, dbt, Spark: building and taking over data pipelines

How an engagement runs

  1. 01

    Inventory and lineage

    We read the jobs, not the documentation. Output: the real list of what runs, what no longer runs, and what nobody consumes any more.

  2. 02

    Value-based prioritisation

    Not every flow deserves migration. A meaningful share of a legacy estate can often simply be deleted, and that is the cheapest gain available.

  3. 03

    Build and parallel run

    New pipelines run alongside the old ones with automated reconciliation of gaps. Cutover happens only after one full cycle without a gap.

  4. 04

    Decommissioning

    The step everyone skips. We formally switch off the old jobs, archive, and release licences. Otherwise you pay for two platforms for three years.

Need a snowflake consultant?

Short reinforcement, long assignment or dedicated team: we propose a profile suited to your context.

Snowflake consultant

Related technologies

Frequently asked questions

How do we stop the Snowflake bill growing?

By sizing virtual warehouses per use, enabling auto-suspend and setting resource monitors with alerts.

How much does a Snowflake project cost?

The price depends on scope, duration and engagement format. It is set by quote, from a description of your need.

AzerOps · Casablanca

A project, some equipment, a question?

Describe your need in a few lines. You receive a written reply within one business day and a detailed quote, based on your scope.

We value your privacy

Essential cookies, plus analytics if you agree. No advertising.

cookie policy · privacy policy